Table of Contents
Project Overview: Echo Reduction for a School Gymnasium
- Project: Impact-Resistant Acoustic Panels for a School Gym
- Address: 6249 Canal Blvd, New Orleans, LA 70124
- Facility Type: School Gymnasium & Multipurpose Event Space
- Client: St. Paul’s Episcopal School
- Objective: Reduce Echo & Improve Speech Clarity for Athletic & Musical Events
- Scope: Acoustic Analysis, Panel Fabrication, Delivery & Installation
St. Paul’s Episcopal School in New Orleans contacted Commercial Acoustics with an urgent problem: excessive echo in their gymnasium. Like many school gyms, the space doubled as both an athletic facility and a performance venue. With a high-profile fundraiser and brass band concert just weeks away, the administration needed a solution that could improve speech clarity and overall acoustics—without interrupting school operations.
The challenge was one that our team sees often. Gymnasiums are built from hard, parallel surfaces—concrete floors, block walls, and metal deck ceilings—that trap and amplify sound. As a result, even basic activities like PE classes or assemblies can become uncomfortably loud. Without proper acoustic treatment, speech intelligibility suffers, and musical performances can sound harsh and distorted.

New Orleans Gym Acoustic Treatment Challenges
- High Reverberation: Excessive Echo from Reflective Wall & Ceiling Surfaces
- Time Constraints: Two-Week Turnaround Before a Live Event
- Durability Needs: Panels Designed to Withstand Impact from Sports Activities
When our acoustical engineer visited the site, we performed a reverberation time (RT60) test to measure how long sound persisted in the space. Using Sabins calculations, we modeled the required absorptive area to bring the reverberation time from over two seconds down to a target of roughly one second—ideal for both speech and music clarity. This gym acoustic treatment analysis guided a fast-track fabrication plan tailored to the school’s tight deadline.

Acoustic Solution: Impact-Resistant Panels Installed on Site
- Material: 4’x8’ Wall-Mounted Acoustic Panels, 2” Thick Fiberglass Core
- Finish: Acoustical Fabric Color Selected by the Client
- Performance: RT60 Reduced from 2.3 Seconds to 1.1 Seconds
Commercial Acoustics fabricated and delivered the panels within a week, far faster than standard industry lead times. Each panel was constructed using high-density fiberglass for optimal absorption and wrapped in a durable acoustical fabric specifically designed for gym acoustic treatment applications, ensuring long-term performance in active environments.
Installation required just two technicians and a 25’ scissor lift. The team mounted panels directly into the underlying metal studs, ensuring a secure, long-lasting setup. Although two full days were allocated for the job, it was completed in under eight hours—demonstrating how efficient gym acoustic treatment can transform a space’s sound profile in a single workday.
Post-installation testing confirmed a dramatic improvement in clarity. The reverberation time dropped nearly in half, making announcements, music, and crowd interactions far more intelligible. Teachers and staff immediately noted the difference during classes and assemblies, and the upcoming fundraiser was able to proceed with excellent sound quality.

Results: Clear Sound for Sports & School Events
- RT60 Reduction: From 2.3 to 1.1 Seconds
- Completion Time: Full Installation Finished in One Day
- Outcome: Ready for the Live Brass Band Performance with Improved Clarity
The St. Paul’s project showcases how targeted acoustic treatment can quickly convert a challenging environment into a functional, multipurpose venue. By focusing on impact-resistant, high-NRC wall panels, the solution balanced performance, aesthetics, and durability—all within the school’s compressed schedule.
Commercial Acoustics continues to assist educational facilities across Louisiana and the Gulf Coast, providing gym acoustic treatment expertise, data-driven acoustic analysis, product fabrication, and turnkey installation services that meet both design and budget requirements.

Conclusion: Delivering Fast-Track Gym Acoustic Solutions
Gym acoustic treatment requires precision and speed—especially in educational environments where spaces serve multiple functions. At St. Paul’s Episcopal School, our rapid fabrication and installation approach provided measurable improvements in both clarity and comfort without disrupting daily use.
Whether the need is for a school gym, auditorium, or multipurpose space, Commercial Acoustics offers engineered solutions that achieve measurable acoustic performance. To discuss your next project or request a site assessment, contact Commercial Acoustics.

FAQs: Gym Acoustic Treatment & School Sound Control
Why are gymnasiums so echo-prone?
Their hard, parallel surfaces—like block walls, wood floors, and metal ceilings—reflect sound instead of absorbing it, creating long reverberation times and poor clarity. Without proper gym acoustic treatment, these reflective surfaces allow sound to build up and echo throughout the space.
How much acoustic treatment does a gym typically need?
Depending on the size, most gyms require 25–40% wall coverage with high-NRC panels to achieve a balanced reverberation time of around one second. A properly designed gym acoustic treatment plan ensures consistent sound control across the entire space, improving both speech clarity and comfort.
Are acoustic panels safe for active environments?
Yes. Impact-resistant panels and tightly stretched fabric systems are designed for high-activity areas like gyms, ensuring long-term durability and easy maintenance.
Can Commercial Acoustics help with our school gym project?
Yes. We provide on-site measurements, modeling, product design, and installation for gymnasiums and multipurpose spaces nationwide—delivering both acoustic precision and visual appeal.

